Gallery

 

Onshore
Ensuring no newts on substation site prior to work start  Horizontal directional drilling along cable route  Horizontal directional drilling at Weybourne Hope  Preparation work at onshore substation  Work starts at onshore substation  Laying cable ducting
Ensuring no newts on substation site prior to work start
(June 2009)
Horizontal directional
drilling along cable route
(2009)
Horizontal directional drilling at Weybourne Hope
(2009)
Preparation work at onshore substation
(2009)
Work starts at onshore substation
(2009)
Laying cable ducting
(2009)
Download image Download image Download image Download image Download image Download image

 

Cable jointing work (2010)  Cable pulling  Construction of Salle substation, March 2010 
Cable jointing work
(2010)
Cable pulling (2010) Construction of Salle substation
(March 2010)
     
Download image Download image Download image      
Operation - Wells-next-the-Sea
Dredger Kari Hege at work  Aerial of operations harbour  Aerial of operations harbour  Dredger Kari Hege at pontoons  Dredger Kari Hege at pontoons
Dredger Kari Hege at work
(2009)
Aerial of operations harbour
(March 2010)
Aerial of operations harbour
(March 2010)
Dredger Kari Hege at pontoons
(March 2010)
Dredger Kari Hege at pontoons
(March 2010)
Download image Download image Download image Download image Download image
The completed pontoons and jetty at Buxton's Bight  Aerial of the completed harbour at Buxton's Bight (April 2010)   
The completed pontoons and jetty at Buxton's Bight
(March 2010)
Aerial of the completed harbour at Buxton's Bight
(April 2010)
Aerial of the completed harbour at Buxton's Bight
(April 2010)
   
Download image Download image Download image    
Offshore
Vessel Nordnes used for rock placement phase  Horizontal directional drilling at Weybourne  Transition pieces on the way to the windfarm site  Transition pieces on the way to the windfarm site  Transition pieces on the way to the windfarm site  HLV Svanen 
Vessel Nordnes used for rock placement phase Horizontal directional drilling at Weybourne Transition pieces on the way to the windfarm site (April 2010) HLV Svanen
Download Image Download Image Download Image        Download Image Download Image Download Image
"Toisa Sonata" ready to leave Vlissingen with a monopile and transition piece.  The Svanen and Toisa Sonata on the Sheringham Shoal site.      Cable being loaded onto Team Oman 2010. 
"Toisa Sonata" ready to leave Vlissingen with a monopile and transition piece. The Svanen and Toisa Sonata on the Sheringham Shoal site. Installed foundations (2010) Cable being loaded onto Team Oman (2010)  
Download Image Download Image Download Image Download Image Download Image  
Cable loaded onto Team Oman 2010.  The two Offshore Substations being loaded onto the barge at Hartlepool  The two Offshore Substations being loaded onto the barge at Hartlepool  Substations being lifted onto foundations by the crane vessel Oleg Strashnov  Substations being lifted onto foundations by the crane vessel Oleg Strashnov
Cable loaded onto
Team Oman (2010)
The two Offshore Substations being loaded onto the barge
at Hartlepool
Substations being lifted onto foundations by the
crane vessel Oleg Strashnov
Download Image Download Image Download Image Download Image Download Image
The successful installation of the two substations is a key milestone in the project  The successful installation of the two substations is a key milestone
The successful installation of the two substations
is a key milestone in the project
Download Image Download Image
CGI
CGI of wind farm  CGI of offshore substation 
CGI of wind farm CGI of offshore substation      
Download Image Download Image      
People
Fishing Liaison Officer Alan Cooper  Plant Manager Einar Strømsvåg  Project Director Rune Rønvik  Project Manager for Wells Jetty Development Charlie Ward 
Fishing Liaison Officer Alan Cooper Plant Manager Einar Strømsvåg Project Director Rune Rønvik Project Manager for Wells Jetty Development Charlie Ward Stakeholder Manager
Kari Hege Mørk
Download Image Download Image Download Image Download Image Download Image
Community
Artist impression of The Mo  Rejuvenated pond at Plumstead  Sponsors of Greenbuild 2009  Wells Christmas Tide 2009 
Artist impression of The Mo Rejuvenated pond at Plumstead Sponsors of Greenbuild
(2009)
Wells Christmas Tide
(2009)
Sponsors of Greenbuild
(2010)
Download Image Download Image Download Image Download Image Download Image
Project Director Rune Rønvik with MP Norman Lamb.
Project Director Rune Rønvik
with MP Norman Lamb.
(2010)
Download Image